Show / Hide Table of Contents

    Job Planning Lines

    Object Definition

    Object TypePageExtension
    Object ID70219934
    Object NameQWESP Job Planning Lines
    ExtendsJob Planning Lines

    Controls

    Type Caption ToolTip
    Field Extra Code 1 Specifies the extra code 1.
    Field Extra Code 2 Specifies the extra code 2.
    Field Extra Code 3 Specifies the extra code 3.
    Field Extra Code 4 Specifies the extra code 4.
    Field Reallocated from Project Task No. Specifies the project task number from which it was reallocated.
    Field Reallocated from Line No. Specifies the line number from which it was reallocated.
    Field Reallocated Quantity Specifies the reallocated quantity.
    Action Reallocate Reallocate planning lines. This function can be used to move the quantity to another project task.

    This documentation is generated from StoryPoint v26.0

    Back to top Copyright © 2020 SmartApps
    Generated by DocFX