Show / Hide Table of Contents

    Resource Time Lines

    Object Definition

    Object TypePage
    Object ID70219913
    Object NameQWESP Resource Time Lines
    Source TableDate

    Controls

    Type Caption ToolTip
    Field Period Start Specifies the period start.
    Field Period Name Specifies the period name.
    Field Capacity Specifies the resource capacity during the specific period.
    Field Open Specifies the quantity that has not yet been submitted during the specific period.
    Field Submitted Specifies the quantity that has been submitted by the time sheet owner waiting for approval by the time sheet approver during the specific period.
    Field Approved Specifies the quantity that has been approved during the specific period.
    Field Posted Specifies the quantity that has been posted to the project ledger entries during the specific period.
    Field Rejected Specifies the quantity that has been rejected during the specific period.

    This documentation is generated from StoryPoint v26.0

    Back to top Copyright © 2020 SmartApps
    Generated by DocFX